Rabu, 15 Julai 2009
ANNOUNCEMENT !!!
Sabtu, 4 Julai 2009
General
:: WELCOME ::
The Deepwater Floating Structure Model Competition has been organized by the Faculty of Civil Engineering in faculty level. Owing to the interest and support shown by the previous participants, Faculty of Civil Engineering is encouraged to organize this competition in a bigger scale with the participation open to all undergraduate students of Universiti Teknologi Malaysia and invited universities under the Shell Campus Ambassador program. This competition is aimed to provide a platform for university students to gain exposure in the field of offshore engineering especially in the design of deepwater floating structures. This program is supported by the Faculty of Mechanical and Kolej Tun Hussein Onn and sponsored by Shell.
PARTICIPANT
Open to all undergraduate students of Universiti Teknologi Malaysia
VENUE
Dewan Tun Hussein Onn (DKTHO)
Kolej Tun Hussein Onn
Universiti Teknologi Malaysia
Skudai, Johor
SUBMISSION
Entry form and proposal must be submitted to the Organizer at Postgraduate Office (M47-FKA) or email to norhazilan@utm.my before 15th July 2009.
"EXPLORING THE FRONTIER"
Enquiries
:: ENQUIRIES ::
For further information please do not hesitate to contact:
Assoc. Prof. Dr. Nordin bin Yahaya
07-5535760
nordiny@utm.my
Dr. Norhazilan Md Noor
012-5768115
norhazilan@utm.my
Mr. Lim Kar Sing
013-7113167
lks726@gmail.com
Mr. Kang Hooi Siang
017-7848842
kanghs@fkm.utm.my
Committee Members
:: COMMITTEE MEMBERS::
Director
Mr. Lim Kar Sing
Deputy Director
Mr. Mohd Syerwan Mohd Sani
Secretary
Miss Shadiah Husna Mohd Nor
Committee
Assoc. Prof. Dr. Nordin bin Yahaya
Assoc. Prof. Dr. Omar bin Yaakob
Dr. Norhazilan bin Md. Noor
Mr. Kang Hooi Siang
Mr. Mohd Nazmi bin Ismail
Mr. Mohd Hazri bin Ishak
Miss Siti Rabe'ah binti Othman
Mr. Ong Hock Chye
Mr. Azizul bin Azman
Miss Nor Apaziah binti Nor Ozman
Miss Norhamimi binti Mohd Hanafiah
College Tun Hussein Onn Student Committe (JKM KTHO)
Jumaat, 3 Julai 2009
Important Dates
:: IMPORTANT DATES ::
16 July 2009 - Announcement For The Qualified Team
17 July 2009 - Introduction To Floating Structure Stability
25 July 2009 - Competition Day
Judging Criteria
:: JUDGING CRITERIA ::
- The team with the highest Efficiency Factor will receive 55 points. The other teams will be given points on a decreasing scale based on the ratio of their Efficiency Factors relative to the winning team’s Efficiency factor.
- The structure supporting the greatest weight will be given 30 points, and the rest of the teams will be awarded points on a decreasing scale based on the ratio of weights they hold to the winning team’s weight.
- The promotional presentation will be worth 15 points, with the judges’ decision to be based on the features such as presentation skills, knowledge of physical science, audience appeal and others.
Rules & Regulations
- Plain straw
- Masking tape
- Strand/ string
- Mineral water bottle (500ml)
- One knife and scissor
- A3 paper
- Foam cup
Specifications:
- Overall structures sizes
- Height: 600mm (maximum)
- Base (top): 180mm x 180mm
- Base (bottom): 350mm x 350mm
Basic Materials:
Each team will be provided with basic materials worth of RM 15million to construct the floating structure as follows:
- 6 bottles of mineral water (RM 6 mil)
- 1 meter of strand (RM 1 mil)
- 1 nos of masking tape (RM 2 mil)
- 1 sheet of A3 paper (RM 1 mil)
- 10 nos of plain straw (RM 1 mil)
- 4 nos of foam cup (RM 4 mil)
Limitations:
- Straws cannot be treated in any way to change their strength or appearance
- Each team will initially be provided with basic materials worth RM 15mil to construct the structure
- Extra materials can be purchased from the organizer. However the price will increase from time to time at the discretion of the organizer
- The supplied plastic bottles contain drinkable mineral water. If contestants decide to empty the bottles, the water must not be thrown away. Instead, the members of the team must drink the water to avoid any waste or they can use any container from materials provided by the organizer. Failure to comply; a point deduction will be sternly implemented or team can be disqualified from the competition.
- Prior to the testing of the structure in the basin, each team must promote their structure by giving a sales presentation using a PowerPoint presentation to the public (5 minutes time limit strictly enforced).
- Contestants are not allowed to bring any prototype or model built prior to the competition into the competition hall.
- The structure must float freely without any mooring system.
- During the test, the loading process will be carried out until the structure reaches the allowable maximum draught of 20 cm.
Participant shall be disqualified from the competition if:
- The dimension of the structure is greater than the maximum specified dimension:
- Height: 600mm (maximum)
- Base (top): 180mm x 180mm
- Base (bottom): 350mm x 350mm
- The construction of the structure takes more than 5 hours
- The presentation is more than 5 minutes
- Any materials others than those specified are used
- Load container will not rest on top
Goal:
- The team should aim to design a structure with the maximum load bearing capability, stable with minimum cost.
- This is quantified by the Efficiency Factors:
Tentative
:: TENTATIVE ::
Wednesday (15 July 2009)
Due date for proposal submission
Thursday (16 July 2009)
Announcement for the qualified team
Friday (17 July 2009)
3pm – 5pm : Introduction to floating structure stability
Saturday (25 July 2009)
07.30am : Registration
08.00am : Talk By Shell
08.30am : Competition briefing and Q&A session
09.30am : Start competition
01.00pm : Lunch
02.00pm : Final touch-up
03.30pm : Presentation, testing and evaluations
05.45pm : Prizes giving
Participant
- Open to all undergraduate students of Universiti Teknologi Malaysia and team under SHELL ambassador programe.
- Each team must consists of 5 members only.
- Any team with less or more than five persons in group will be disqualified
- Please click here to download the Entry Form